Saturday, May 24, 2008

Latihan Industri Hujung Minggu 4

Week 4, another bland and simple week. More time measurement. More of the hot and humid assembly lines with no engine sub assembly in sight. And more Excel data entry. This week proved to be a very long week as it is the second week I have to endure this ceaseless boredom with out a Friday lay off day. Well, at least there IS an end in sight as my time as a trainee here is quite short indeed.

This week while i was at work at the sub assembly lines where small bits get put together in to bigger pieces of the car e.g Dashboard, Engine, Axle etc etc, I found some really nice people. They were willingly cooperating with me in my attempt to measure the cycle time of the sub assembly lines. For instance there is this uncle at the radiator sub assembly whom is in his late 40's who would tell me his cerita2 lama and do the operations step by step so that i could catch up and note it all down on the list. The mute guy and gals would also do the same and they even paused a while and pointed to me which step in the list they had just done and waited for me to write down the time and then only continuing. I wished the rest of the ppl at the assembly line.
That would help me a great deal and I would've had the complete data by now. But no~ they just did what they pleased and made life so difficult for me on the main assembly line.

To the ones who were of great help to me, I would like to extend my deepest appreciation to these nice and helpful people! YAY and now to some of the more humourous things i found during week 4 of industrial training. The following picture is the product of a "dialogue" that i had with one of the mute workers at the sub assembly line called Syafinas. Very helpful person who signalled me when she started a process and signaled me to stop the stopwatch when she is done with it and points out which item in the list was it. She asked me what I was there for and i answered that i was there to take the cycle time for the dashboard sub assembly.



She then told me that she is doing the S80 dashboard sub assembly just in case I didn't know in line 2 and then i asked her whether she is also in charge of the door panel sub assembly in line 3. In line 4 she claims that she not do work. Hmmm.... Is this the confession from a worker that she slacks off during work? Hahaha i hope not...

The following picture is a material requisition form (obviously) that my colleague asked me to send to the stockist to acquire the listed items. What instantly caught my attention was the units for the items in the list.



WD40 for those who have never heard of it or used it, is an aerosol lubricant that is sprayed to loosen rusty metal such as your pad locks, nuts and bolts. So naturally, they come in CANs right? But it seemed that my colleague got it slight wrong by determining that WD40s should be punished and "disebat" 3 kali untuk sex offense against women.

I finished the week with quite some data and am quite pleased with the nice people whom showed their invaluable cooperation to aid my data collection.

Wednesday, May 14, 2008

Latihan Industri Hujung Minggu 3

This week is the week where my industrial training got from kinda boring to BBBOOOORRRIIIINNNGGGG.........

Yes its the week of boredom for me in Sweedish Motor Assemblies. On Monday i printed out a 3 inch thick stack of spreadsheets that I have painstakingly prepared throughout the first 2 weeks of my industrial training. It took me a whole damn day to print out these spreadsheets as the printer was acting up, printing only the first column and moves on to the next page to pring the next column and so on.

After wasting the whole morning messing around with the printer settings and getting the print outs right, it is already time for tea break. I went up to the cafeteria to grab some "char bee hoon" and Nescafe (really sleepy waiting for the bublejet printer to get along with its business of printing) and then went to the toilet to take a leak. Out of curiosity, I ventured in to another cubicle and found some more interesting artwork done by grownups which I included in this post below for your viewing pleasure:



The artist seem to have a deep liking for the female body, especially the breasts for that matter which can be seen by the art piece on your left but the poor fellow's artwork got defiled by other busybodies whom think that the picture wasnt complete and added stuff behind the female. On the right are artist impressions on what happens to breasts if they are fondled with too much and the depictions of breasts sagging along with the before and after labels show how much sagging the artist thinks breasts would undergo.



This one is a horizontal view of 2 people having penetrative sex. I am unsure about who this "Zaiton" is but i have a hunch taufik here refers to the senior HR Manager in SMA.

So after spending the rest of the day printing out the spreadsheets and sorting them out, it was time to staple them together. Problem was, some were more than 25 pages thick
too thick for a normal stapler to staple together. The next problem is there aint no big staplers in the whole factory!! OMFG!! We are talking about a factory that prides itself with its ISO 9001 and ISO 14000 certification here and it turns out, they did not have one of those BIG staplers that we usually c in the photocopy shops. This factory has more than 5 photo copy machines and still no sign of BFS (Big F***in Stapler)

I had to resort to brute force. Went to the tool shelf and got the hammer out! Hammered the stapler quite hard to cause successful penetration and then hammer the ends of the staple down to strengthen the tie. This process is repeated 3 times in parallel direction to increase tie strength, hence creating a durable booklet to endure the ravages of the production line.

In one of my trips to the office, I met up wiht my supervisor's boss (my boss oso la) and she asked me to go see her the first thing the next morning. And so i did as she told me right after morning stretching. Sadly the reason she asked me to see her was to make me photocopy the Operational Sequence Summary for 2 trucks that are going to be produced on contract here in SMA.

Hence i spent the half a day by the photocopy machine and the other half of the day at the table stamping the "Controlled Document" stamp on the documents and then filing them up accordingly.

After this rather unamusing day of easy labour, I continued on with the cycle time measurement for the rest of the week feeling rather lost trying to keep up with more than one person at the same station who not only does the assembly a few steps at a time, they seem to even share jobs as well making it a real mess to measure the cycletime.

Thursday, May 8, 2008

Latihan Industri Hujung Minggu 2

Second week of industrial training in KL and I was all alone at home as my causin went to Shanghai with this Girlfriend to visit his mother there. I know this is kind of late to post this but i was kinda busy over the weekend so heres the round up for week 2 of my industrial training....

My week started off as usual with my supervisor (Azril) asking me to hurry up with the OSS (Operational Sequence Summary) list that I have been painfully updating since day 2 of the training. The whole weeks worth of working days were spent in the cold but cheerful CMM (Computer Measuring Machine) room labouring away the hours as the OSS list slowly reaches completion.

This week was particularly nice as it has a public holiday (Labour's Day) as well as Friday lay-off day, hence reducing the total working days for this week to a meager 3 days of work!! WOOHOO!!! SUPER LONG WEEKEND!!!

In theory, this is supposed to be syiok giler la rite? But as it turns out it was a really taxing weekend. When I habis kerja, I made my journey home (where else la..) and when I got home, I quickly ran upstairs, flinging my bag to a side and went in to the shower. My old class mate who is still studying at Taylor's College had bought tickets to Iron Man at 8pm. Reached Sunway Pyramid at 6.30 pm and met up with him and Teoh and we had McDonalds for dinner after a lengthy, undecided, unsure and confused discussion on what to have for dinner. Used some coupons and got a free Fillet O' Fish together with my McValue BigMac... Nice and filling.....

Iron Man was nice and exceeded my expectation (was expecting the usual cheesy Marvel superhero mambo jumbo) as it turned out to be quite intresting. Hope they do not screw up the sequel though... After the movie we parted ways and I headed to Sungai Long to watch Chelsea vs Liverpool or was it MU vs Chelsea??? either way they are the same to me as it was so boring i fell asleeop at the mamak stall and they had to bring me back to Julian's house and continued watching there.

When i woke up the next afternoon, we had Dominos Pizza for lunch and played some PS2 games. I went home in the evening and had dinner with my aunt. After dinner I bathed for the first time in 24 hours and started work on the OSS lists again. Feeling too tired and bored from all those senseless numbers, I ended up chatting online and went to sleep.

When I woke up the next morning, after having ample sleep, I smsed Julian and Teoh whom were already working on friday morning to taunt them and got to work on the spreadsheets finishing them around 12am that night.

I started packing up some clothes to attend the Incovar Graduates Camp (I know i havent graduated yet! You dont need to tell me that!) and thats when Teoh called me and asked me if he could bunk in at my place for the night as it was nearer to get to the camp rendezvous point the next morning.

I will leave the details on how he got lost and then I got lost in KL and ended up reaching home at 2.30am. All I could say was, the camp was really informative and tiring as the camp schedule was really jam packed like some intensive training.

When the camp ended there was no crying or hugging due to the hectic camp schedule that reduced human interaction. Had dinner with some friends (that I have already known before the camp) and reached home a tired person. Chatted with my causin about his Shanghai trip and then went to bed.

Intresting, informative, intensive, tiring and inspiring weekend. Nice.... Looking foward to my next weekend here and the escapades that are possible as my causin will be in Singapore to see his girlfriend the whole weekend....