Wednesday, May 14, 2008

Latihan Industri Hujung Minggu 3

This week is the week where my industrial training got from kinda boring to BBBOOOORRRIIIINNNGGGG.........

Yes its the week of boredom for me in Sweedish Motor Assemblies. On Monday i printed out a 3 inch thick stack of spreadsheets that I have painstakingly prepared throughout the first 2 weeks of my industrial training. It took me a whole damn day to print out these spreadsheets as the printer was acting up, printing only the first column and moves on to the next page to pring the next column and so on.

After wasting the whole morning messing around with the printer settings and getting the print outs right, it is already time for tea break. I went up to the cafeteria to grab some "char bee hoon" and Nescafe (really sleepy waiting for the bublejet printer to get along with its business of printing) and then went to the toilet to take a leak. Out of curiosity, I ventured in to another cubicle and found some more interesting artwork done by grownups which I included in this post below for your viewing pleasure:



The artist seem to have a deep liking for the female body, especially the breasts for that matter which can be seen by the art piece on your left but the poor fellow's artwork got defiled by other busybodies whom think that the picture wasnt complete and added stuff behind the female. On the right are artist impressions on what happens to breasts if they are fondled with too much and the depictions of breasts sagging along with the before and after labels show how much sagging the artist thinks breasts would undergo.



This one is a horizontal view of 2 people having penetrative sex. I am unsure about who this "Zaiton" is but i have a hunch taufik here refers to the senior HR Manager in SMA.

So after spending the rest of the day printing out the spreadsheets and sorting them out, it was time to staple them together. Problem was, some were more than 25 pages thick
too thick for a normal stapler to staple together. The next problem is there aint no big staplers in the whole factory!! OMFG!! We are talking about a factory that prides itself with its ISO 9001 and ISO 14000 certification here and it turns out, they did not have one of those BIG staplers that we usually c in the photocopy shops. This factory has more than 5 photo copy machines and still no sign of BFS (Big F***in Stapler)

I had to resort to brute force. Went to the tool shelf and got the hammer out! Hammered the stapler quite hard to cause successful penetration and then hammer the ends of the staple down to strengthen the tie. This process is repeated 3 times in parallel direction to increase tie strength, hence creating a durable booklet to endure the ravages of the production line.

In one of my trips to the office, I met up wiht my supervisor's boss (my boss oso la) and she asked me to go see her the first thing the next morning. And so i did as she told me right after morning stretching. Sadly the reason she asked me to see her was to make me photocopy the Operational Sequence Summary for 2 trucks that are going to be produced on contract here in SMA.

Hence i spent the half a day by the photocopy machine and the other half of the day at the table stamping the "Controlled Document" stamp on the documents and then filing them up accordingly.

After this rather unamusing day of easy labour, I continued on with the cycle time measurement for the rest of the week feeling rather lost trying to keep up with more than one person at the same station who not only does the assembly a few steps at a time, they seem to even share jobs as well making it a real mess to measure the cycletime.

1 comment:

angelinemiss said...

hahaha.. the ppl working kat itu Volvo company damn 'talented' lor.... can draw till like this.. HAHA!